Piczo

Log in!
Stay Signed In
Do you want to access your site more quickly on this computer? Check this box, and your username and password will be remembered for two weeks. Click logout to turn this off.

Stay Safe
Do not check this box if you are using a public computer. You don't want anyone seeing your personal info or messing with your site.
Ok, I got it
Empfangsgebaude (Station Building)
The station was first seen in an article by Rolf Knipper MIBA-SPEZIAL 8 Juni 91.
Rolf gave a step by step construction method in script (German) and Photo's showing how it all went together.
The basis of the building are 2 Pola-Umfallklinic's and some minor scratch building on the frontage and roof area's.
These kits were used as the scale size looked good and they were constructed of sandstone and would give a good representation of the prototype building.
FRONT OF BUILDING

Pillars are made from wooden dowel and plastic card
PLATFORM SIDE

Roof made from plastic card covered with wet and dry paper
END ELEVATION

The building has spent a few days outside to dull the paintwork(natural weathering). I generally leave it until I get the effect I like.
Back To Home Page